The Bandra Kurla Complex (BKC) station on Metro Line 3 (Colaba--Bandra--SEEPZ) has marked an overall progress of 54 per cent so far, according to the Mumbai Metro Rail Corporation (MMRC).
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.freepressjournal.in/mumbai/mumbai-mmrc-completes-54-work-on-metro-line-3-longest-station-bkc
Mumbai: MMRC completes 54% work on Metro Line-3 longest station 'BKC'
www.freepressjournal.in