AM Nuttall and Doosan Enpure get the five-year contract to design, construct, and commission the new sewage treatment plant. Work includes a “1.5km, 1,500mm-diameter tunnel.
https://www.guildford-dragon.com/2021/08/13/thames-water-choses-firms-to-relocate-sewage-works/
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.guildford-dragon.com/2021/08/13/thames-water-choses-firms-to-relocate-sewage-works/
Thames Water Choses Firms To Relocate Sewage Works
www.guildford-dragon.comGuildford News