Russia's Deputy Prime Minister Marat Khusnullin said in an interview that proposed Jubga-Sochi highway would is estimated at more than 1.4 trillion rubles. It will be postponed if costs can not be reduced.
Project has tunnel and overpass parts.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.interfax.ru/russia/812696
- -
www.interfax.ru