13 Months to the arrival of the Tunnel Boring Machine and the teams to start the boring under the canal for the tunnel of Línea 3 del Metro (Panama Metro Line 3). This was reported by Radio Panama.
The construction of the 5.3 kilometer long tunnel under the Panama Canal, as well as the Panama Metro Line 3 is conducted by the HPH Consortium. The all-Korean consortium is made up of the companies Hyundai Engineering & Construction Co., Ltd., Posco Engineering & Construction Co. and Hyundai Engineering Co. Ltd.
For crossing the Panama Canal, the tunnel option had won over a bridge option, most likely due to the height of the large ships passing through the tunnel.
Later for geophysical studies of the tunnel, the only bidder was the Geofísica Túnel L3 consortium, made up of the companies Monitoriza, S.A. and the Spanish company Geotecnia Hidrogeología y Medio Ambiente S.P.L. (Gehym) with a bidding price lower than the reference price ($163,177.40 versus $181,950.00).
map- Panama Metro Line 3 (map El Metro de Panama)
Panama Metro on Line 3.
El consorcio coreanoHPH Joint Venture, encargado de la construcción de la línea 3 del Metro hacia Panamá Oeste, también se encargará de la construcción del túnel.
Túnel para la Línea 3 del Metro será construido por consorcio coreano
https://www.tvn-2.com/nacionales/Tunel-Linea-Metro-construido-consorcio-video_0_6076642321.html
El ministro de Obras Públicas, Rafael Sabonge, informó que el túnel de la Línea 3 del Metro será hecho por el consorcio coreano HPH Joint Venturecon, mismo que lleva adelante la obra ferroviaria, con el objetivo de que cuando termine la...
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
The Korean consortium HPH consortium building the Panama Canal Tunnel as well as the rest of Line 3 of Panama
https://consorciolinea3.com/consorcio-hph-joint-venture
Consorcio HPH JV | HPH Consorcio - Línea 3 del Metro de Panamá
consorciolinea3.com