Here is a recent look at the construction of the new Karanga a Hape Station (Karangahape). With the use of a drone, we captured what it would feel like to drop down into the Mercury Lane station box, descend through the levels, and down to what will be platform level. We also captured footage within the northbound tunnel, where our Dame Whina Cooper Tunnel Boring Machine (TBM) will break through into Karanga a Hape Station in mid-2022.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
www.youtube.com