English | Spanish | Dutch
Log in

[Victoria] North East Link ready for major tunnelling works

    Panos Samothrakis

    Two TBMs are on their way to begin work on the major tunnels for the project. Each machine will be 90 m long, with a diameter of 15.6 m and an approximate weight of 4000 tonnes.

    https://www.trenchless-australasia.com/2022/08/15/north-east-link-ready-for-major-tunnelling-works/

    Null

    image

    image