English | Spanish | Dutch
Log in

Jammu And Kashmir: 9.8 km Tunnel On Banihal-Katra Rail Link Completed

    A. Luthra
    By A. Luthra Replies (1)

    The construction of the 9.8km long tunnel connecting two stations on Banihal-Katra railway link in Jammu and Kashmir is now complete.

    https://www.outlookindia.com/national/jammu-and-kashmir-9-8-km-tunnel-on-banihal-katra-rail-link-completed-news-219833

    image

    image