English | Spanish | Dutch
Log in

Pakistan: CGGC started remedial work of collapse at Neelum Jhelum tunnel construction

    Zaka Kazim Khan

    China Gezhouba Group Company (CGGC) is doing on remedial works  at Tail Race Tunnel of the Neelum Jhelum Hydropower Project (NJHP) following interruption in July 2022 when a part of tunnel collapsed. Total length of tunnels is between 52 km 68 km depending on information source.

    https://pakobserver.net/cggc-working-nonstop-on-remedial-works-of-nelum-jhelum-hp/

     

    image

    image