English | Spanish | Dutch
Log in

Afcons Achieves Another Breakthrough with TBM Sudarshan 8.1 at Begumpul RRTS Station

    Ansh Chaturvedi

    Afcons achieved its fifth tunnel breakthrough out of the six planned breakthroughs on Package 8 of the semi-high-speed rail project, with S88 marking the final breakthrough on the 5.68 km underground section.

    https://www.metrorailnews.in/afcons-achieves-another-breakthrough-with-tbm-s88-at-begumpul-rrts-station/

    image

    image