Work on the secondary lining of Tideway’s 4.5km Greenwich connection tunnel between Greenwich and Bermondsey has been finished.
https://www.geplus.co.uk/news/tideway-greenwich-connection-tunnel-complete-with-secondary-lining-10-08-2023/
The end of secondary lining, which marks the completion of the Greenwich connection tunnel, is another major milestone for London’s “super sewer” project
https://www.geplus.co.uk/news/tideway-greenwich-connection-tunnel-complete-with-secondary-lining-10-08-2023/
Tideway: Greenwich connection tunnel finished after secondary lining | Ground Engineering (GE)
www.geplus.co.ukThe end of secondary lining, which marks the completion of the Greenwich connection tunnel, is another major milestone for London’s “super sewer” project