English | Spanish | Dutch
Log in

Indian Railways Engineers develop new tunnelling method for Kashmir rail link project

    A. Luthra
    By A. Luthra Replies (1)

    Indian Railways engineers have developed a new tunnelling method in the most challenging part of the 111-km-long Katra-Banihal section of the Kashmir rail link project.

    Tunnel-1 is a 3.2-km-long single tube tunnel, located at the foot of the Trikuta Hills in the Katra-Reasi section of the  project.

    Most interesting to read:

    https://telanganatoday.com/engineers-develop-new-tunnelling-method-for-kashmir-rail-link-project

    image

    image