English | Spanish | Dutch
Log in

Romania: Alina Tunnel, the first on the Sibiu-Piteşti highway, completely dug

    I. Stoica
    By I. Stoica Replies (1)

    The first tunnel on the Sibiu-Piteşti highway, the 1,35 km long Alina Tunnel has been completely excavated.

    https://ziarulunirea.ro/video-tunelul-alina-primul-de-autostrada-sibiu-pitesti-sapat-complet-duminica-va-fi-transformat-in-obiectiv-turistic-937928/

    Null

    image

    image