English | Spanish | Dutch
Log in

TBM Breakthrough: E-BERK's TBM with E-BERK Cutting Tools breaks out to the daylight after a 4716m long, 4,98m diameter tunnelling.

Welcome to the surface! E-BERK's TBM with E-BERK Cutting Tools breaks out to the daylight after a 4716m long, 4,98m diameter tunnelling.

DSİ Pamukluk Dam water conveyance project. Mersin, in the Mediterrenean cost of Türkiye.

image

image