It is a Robbins Double Shield with a diameter of 5,06 meters.
It is reported that it bored 12,2 km in 18 months `8 months ahead of schedule' and with a progress of '1.000 m per month' (this is what Robbins says).
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com