Charlotte is the first of 2 TBS to break through the ground for London’s new super sewer.
It bored the Frogmore Connection Tunnel from Wandsworth to Fulham as part of the Thames Tideway Tunnel project to stop the dumping of untreated sewage to Thames river.
#pollution
https://www.pbctoday.co.uk/news/planning-construction-news/tunnel-boring-super-sewer/66130/
Balfour Beatty, and its joint venture partners Morgan Sindall and BAM Nuttall has seen its TBM break through the ground for London’s new super sewer
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com