Seoul Metropolitan Government announced that it will start construction of the tunnel under the Han River today (Thursday) to build the section between Amsa-dong and Guri-si Topyeong-dong, Gangdong-gu, on the extension of subway line 8. The extension of subway line 8 (Byeolnae) starts from Amsa Station in Gangdong-gu, passes through Guri-si, Gyeonggi-do and extends 12.9km to Namnaeju-si Byeolnae-dong. Six stations will be constructed.
The part in Han River basin will have the tunnel depth 52m and the length of 1,279m. The Han River Basin Tunnel section is a very dangerous and difficult construction section with an atmospheric pressure of up to 4.7 times at a depth of 52m (bottom) from the surface. The pressure (earth pressure and water pressure) of the tunnel penetrating 1,279m of total length is expected to reach 4.7bar (Kg / cm²).
For the tunnel construction the Tunnel Boring Machine will be used for environmental and efficiency reasons. It is bored from Gupyeong Topyeong-dong to Amsa-dong, Gangdong-gu. It is scheduled to be completed in September 2023.
https://www.youthassembly.kr/news/50725
#Korea
서울시는 지하철 8호선 연장(별내)선의 강동구 암사동~구리시 토평동 구간
The Smart Construction Technology and Safety Expo held at KINTEX, Ilsan showcases Korean Tunnel Boring Machine (TBM) and construction industry digitization technologies of BIM (3-D digital modeling), VR (Virtual Reality), AI (AI) and automation based process management.
http://www.conslove.co.kr/news/articleView.html?idxno=62656
#Korea #Construction #Technology
한국건설신문 선태규 기자 = ‘2019 스마트 건설기술·안전 엑스포’가 성황리에 막을 내렸다. 국토교통부는 일산 킨텍스에서 개최된 스마트 건설기술·안전 엑스포는 모두 1만2천여명 관람객이 행사장을 찾았고, 기업 투자유치 5건, 국책연구원 보유 유망기술의 중소기업 무상이전 2건 등 실질적인 성과를 거뒀다고 밝혔다. 첫날 김현미 국토교통부 장관은 개회사를 통해 “핵심기술 조기확보를 위한 대규모 연구개발사업을 연속 추진하고 스마트 건설기술의...
SK E&C is to be selected as a preferred negotiator for Silvertown Tunnel Project.
The company was selected as the preferred bidder for the Silvertown Tunnel project, which was ordered by Transport for London (TfL) in June. SK E&C has formed an investment consortium RiverLinx with four companies: Macquarie Capital (Australia), Sintra (Spain), Aberdeen Standard Investments (UK) and Bam (BAM PPP PGGM (Netherlands)). SK E & C has a 10% stake in Riverings.
This project is to construct two one-way two-lane road tunnels with a total length of 1.4km and a 12.4m diameter through the lower Thames to connect the Silvertown and Greenwich areas of London, England. Is about 1 billion pounds.
SK E&C is in charge of EPC (design, procurement and construction) by constructing a construction consortium with Ferrovial Agroman (Spain) and Bam Nuttall (UK). SK E&C holds a 20% stake.
SK건설은 서유럽 지역에서 최초로 수행하는 개발형사업을 영국 런던에서 획득했다고 26일 밝혔다.이 회사에 따르면 서유럽 지역에서 최초로 수행하는 인프라 민관협력사업(PPP, Public Private Partnership)이다.&nb
#Daewoo Engineering & Construction (Daewoo E&C) wins a US$86 million order for a construction work with an immersed #tunnel in #Iraq.
http://www.businesskorea.co.kr/news/articleView.html?idxno=37234
Daewoo Engineering & Construction (Daewoo E&C) has won a US$86 million order for the construction of a prefabrication yard of an immersed tunnel in Khor Al Zubair, southern Iraq.The builder announced on Oct. 21 (local time) that Safaa Al-Fayyadh,...
A Study on the Behaviour of Group Piles by TBM Tunnel Excavation.
Graduate School of Hanyang University
Jae Woong Kim
https://tunnelcontact.com/discussion/view/5709/a-study-on-the-behavior-of-group-piles-by-tbm-tunnel-excavation
Networking Site for Tunnel Professionals
Prediction of replacement period of shield Tunnel Boring Machine disc cutter using SVM
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com