Chinese technical team arrives in Nepal to conduct a preliminary assessment of the Tokha-Chhahare-Gurjubhannjyang section of the Kathmandu-Rasuwagadhi tunnel road.
The government plans to build a 5-km-long tunnel to connect Tokha with Gurjubhanjyang and a 24-km-long tunnel to connect Betrawati with Rasuwagadhi.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com