From Femern A/S.
A key milestone was reached on 22 December 2022 when Femern A/S and Elecnor signed contracts to establish a transformer station in Rødbyhavn.
Femern A/S has signed a contract for delivery of a...
International formwork and scaffolding expert Doka has been awarded the contract to provide its comprehensive formwork expertise on the Fehmarnbelt Tunnel project, which on completion will be the world's largest immersed tunnel for road and rail...
https://www.youtube.com/watch?v=zf7C5DiEVpA
In the spring, Femern A/S is putting the Fehmarnbelt tunnel’s track and catenary system for electric trains out to tender. The contract is worth around EUR 200m or DKK 1.5bn. Extensive market...
Mainstream media shows interest in Fehmarnbelt Tunnel.
(CNN) — Descending up to 40 meters beneath the Baltic Sea, the world's longest immersed tunnel will
link Denmark and Germany, slashing journey times between the two...
The contractor consortium FLC has completed a full-scale trail casting of a segment of a tunnel element at the construction site at Rødbyhavn.
To ensure a service life of at least 120 years for the upcoming 18km immersed...
https://vimeo.com/569912566
At a meeting on 21 June 2022, the EU member states approved the European Commission's proposal for the allocation of funding for European infrastructure projects. The construction of the Fehmarnbelt tunnel between...
Danish and Polish workers demand that Polish workers are paid the equal salary as the Danish workers. They are striking against the by the international consortium FLC.
Reportedly, hourly rates of the Polish workers are about...
https://www.youtube.com/watch?v=hUZwY7xGMbg
Fehmarnbelt tunnel achieve an important milestone in dredging operations
Dredging operations for the 18 km Fehmarnbelt tunnel to Germany have achieved a major mile-stone. 50 per cent of the tunnel...
NDR (Norddeutscher Rundfunk), a public radio and television broadcaster in northern Germany has broadcast a TV program (only 3vminutes long) on Fehmarnbelt tunnel dredging work.
The world's largest floating dredger excavates the...
• Design & build and maintenance contract for the 18-km-long tunnel between Germany and Denmark
• Renewable and energy-efficiency solutions provided
• Contract worth over DKK 4 billion (€535 million)
VINCI, through its...
This position is for the Femern Belt Link. It is based in Copenhagen.You have to apply by 1 May.
I copy parts of the job description here. You can reach the full text via the link at the bottom.
"
The position
You will...
This position is for Danish speakers.
I copy parts of the job description here. You can reach the full text via the link at the bottom.
Stellenbeschreibung
Als Projektmanager Behörden gehören Sie zur Abteilung für Permits and...
Design Engineer for Tunnel Control and Monitoring System
I copy parts of the job description here. You can reach the full text via the link at the bottom.
The position
You will become part of the Electrical and Mechanical Department within...
Femern says they have awarded the electrical installation work:
The operation of the Fehmarnbelt tunnel is to be CO2-neutral. This calls for intelligent solutions and installations to manage energy consumption in the tunnel effectively. Femern...
Denmark's Auditor General believes that the development company Fehmarn and the Danish Ministry of Transport have taken unnecessary financial risk by starting up the construction before the necessary approval was in place in...
The online edition of the Zeit (Zeit Online) reports that The Federal Administrative Court rejected an urgent application by the Action Alliance against further construction on the Fehmarnbelt. About a week ago the court had ordered...
Following a motion by the action alliance against a fixed Fehmarnbelt link, the Federal Administrative Court in Leipzig has reportedly halted dredging work for the Fehmarnbelt tunnel between Germany and Denmark on the German side.
The...