English | Spanish | Dutch
Log in

Power Construction Corporation of China drilled through Tunnel 3 of the Jakarta-Bandung high speed railway (JBHSR)

    Chu Yang
    By Chu Yang Replies (1)

    he Tunnel 3 of the Jakarta-Bandung high speed railway (JBHSR) project was drilled through on Sunday, which is the third drilled-through tunnel after the Walini Tunnel and Tunnel 5 by Power Construction Corporation of China

    http://www.xinhuanet.com/english/2020-04/26/c_139010003.htm

    image

    image