he Tunnel 3 of the Jakarta-Bandung high speed railway (JBHSR) project was drilled through on Sunday, which is the third drilled-through tunnel after the Walini Tunnel and Tunnel 5 by Power Construction Corporation of China
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
http://www.xinhuanet.com/english/2020-04/26/c_139010003.htm
Tunnel 3 of Indonesia's Jakarta-Bandung high speed railway drilled through - Xinhua | English.news.cn
www.xinhuanet.com