English | Spanish | Dutch
Log in

Aerial LiDAR survey begins for Mumbai-Ahmedabad bullet train project

    Ansh Chaturvedi
    By Ansh Chaturvedi Replies (1)

    Important step for the project with 87.5 km of viaducts and bridges, 25 crossing bridges, a tunnel, 97.50 km of roads, one station, a maintenance depot, 4 sub-maintenance depots.

    https://www.knocksense.com/mumbai/aerial-lidar-survey-begins-for--mumbai-ahmedabad-bullet-train-project

    image

    image