Important step for the project with 87.5 km of viaducts and bridges, 25 crossing bridges, a tunnel, 97.50 km of roads, one station, a maintenance depot, 4 sub-maintenance depots.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.knocksense.com/mumbai/aerial-lidar-survey-begins-for--mumbai-ahmedabad-bullet-train-project
Aerial LiDAR survey begins forĀ Mumbai-Ahmedabad bullet train project
www.knocksense.comThe Mumbai-Ahmedabad bullet train will cover a distance of 508 km in 2 hours, cutting transit time by 5 hours on this route.