Two Tunnel Boring Machines (TBM) arrived from Germany 5 years ago in 2016. It was planned that they would be assembled and become operational in the same year.
Only that, it did not happen. Things went a bit slow with the project and TBMs mothballed in storage places.
Until April 2021. Finally the assembly of the first of the TBMs has started. Theese TBMs are the biggest ones Peru ever seen. The one being assembled has a diameter of 10.27 meters. All things go fine, boring will start in July.
El gigantesco equipo empezará a cavar desde San Luis hacia el Callao. Avanzará cerca de 13 metros por día
Línea 2 del Metro: Se inicia el montaje de la tuneladora que empezará a operar en julio.
La maquinaria, ubicada en la estación San Juan de Dios, en San Luis, es la más grande para construcción de infraestructura que se ha visto en el...
El gigantesco equipo empezará a cavar desde San Luis hacia el Callao. Avanzará cerca de 13 metros por día
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.efe.com/efe/america/economia/instalan-primera-tuneladora-para-perforar-el-metro-de-lima-tras-cinco-anos-detenida/20000011-4526132
Instalan primera tuneladora para perforar el Metro de Lima tras cinco años detenida
www.efe.comLa primera de las dos tuneladoras que perforarán el túnel de la Línea 2 del Metro de Lima comenzó a instalarse cinco años después de que las gigantescas maquinarias llegaran al país procedentes de Ale