The China-Laos Railway more than 1,000 kilometers long, from Kunming, the capital of Yunnan Province in north to Vientiane, the capital of Laos. 169 tunnels more than 590 kilometers, accounting for 63% of total length of line.
English
Last tunnel of China-Laos railway drilled. The 9,509-meter-long Jingzhai tunnel of the China-Laos railway was successfully drilled through on June 5.
https://global.chinadaily.com.cn/a/202106/05/WS60bb4a05a31024ad0bac3d6d.html
The 9,509-meter-long Jingzhai tunnel of the China-Laos railway was successfully drilled through on June 5.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://big5.sputniknews.cn/society/202106051033836731/
媒體:中老鐵路隧道全部貫通 預計年底開通運營
big5.sputniknews.cn據新華網援引中國鐵路昆明局集團有限公司消息,5日上午,中老鐵路景寨隧道安全貫通。至此,中老鐵路全線167座隧道全部貫通,為年底開通運營奠定了堅實基礎。