After boring 1086 metres, the tunnel boring machine of Bengaluru Metropolitan Rail Corporation Ltd (BMRCL) breaks through at M.G. Road station. Breakthrough was on 6/1/2022. The TBM had started boring on September 5, 2020 from Shivajinagar station.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
Tunnel Breaking Through from Shivaji Nagar to MG Road metro station
www.youtube.com