English | Spanish | Dutch
Log in

Bangalore BMRCL TBM breakthrough at MG Road metro station

    Ansh Chaturvedi

    After boring 1086 metres, the tunnel boring machine of Bengaluru Metropolitan Rail Corporation Ltd (BMRCL) breaks through at M.G. Road station.  Breakthrough was on 6/1/2022. The TBM had started boring on September 5, 2020 from Shivajinagar station.

    image

    image