English | Spanish | Dutch
Log in

Andorra and France sign a protocol to construct a tunnel

    Danilo Merges
    By Danilo Merges Replies (1)

    The proposed tunnel will shorten the travel time between Andorra and Toulouse by 20 minutes. The tunnel will be on the road RN10 and in Tarascon-sur-Ariège. The protocol was signed between the prime ministers of Andorra and France. Construction would start in two or three years and tunnel would finish until 2030.

    https://www.europapress.es/catalunya/andorra-01111/noticia-firman-protocolo-crear-tunel-reducira-trayecto-tolouse-andorra-20220205173358.html

    image

    image