The proposed tunnel will shorten the travel time between Andorra and Toulouse by 20 minutes. The tunnel will be on the road RN10 and in Tarascon-sur-Ariège. The protocol was signed between the prime ministers of Andorra and France. Construction would start in two or three years and tunnel would finish until 2030.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.europapress.es/catalunya/andorra-01111/noticia-firman-protocolo-crear-tunel-reducira-trayecto-tolouse-andorra-20220205173358.html
Firman un protocolo para crear un túnel que reducirá el trayecto entre Toulouse y Andorra
www.europapress.esEl jefe de Gobierno de Andorra, Xavier Espot, ha asistido este sábado a la firma de un protocolo de...