English | Spanish | Dutch
Log in

China Tunnel Technology: Research on an Evaluation Method for the Adaptability of TBM Tunnelling

    Chu Yang
    By Chu Yang Replies (1)

    Research on an Evaluation Method for the Adaptability of TBM Tunnelling

    Zhongsheng Tan 1, Zonglin Li 1, Zhenliang Zhou 1, Haixiang Lai 1, Yifeng Jiao 2, Fengyuan Li 3 and Liming Wang 3

    1 Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
    2 Xinjiang Erqis River Investment Development (Group) Co., LTD, Urumqi 830002, China
    3 State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, China

    Received: 3 April 2022 / Revised: 26 April 2022 / Accepted: 28 April 2022 / Published: 30 April 2022

    https://www.mdpi.com/2076-3417/12/9/4590

    image

    image