English | Spanish | Dutch
Log in

HS2 contractors switch on conveyor to remove spoil from tunnel

    Kris Lubcek
    By Kris Lubcek Replies (1)

    As part of its work as HS2’s main works contractor, the joint venture between Balfour Beatty and Vinci (BBV) has begun using conveyor in a bid reduce the number of HGV movements too and from the site.

    https://www.newcivilengineer.com/latest/hs2-contractors-switch-on-conveyor-to-remove-spoil-from-tunnel-01-07-2022/

    image

    image