As part of its work as HS2’s main works contractor, the joint venture between Balfour Beatty and Vinci (BBV) has begun using conveyor in a bid reduce the number of HGV movements too and from the site.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.newcivilengineer.com/latest/hs2-contractors-switch-on-conveyor-to-remove-spoil-from-tunnel-01-07-2022/
HS2 contractors switch on conveyor to remove spoil from tunnel | New Civil Engineer
www.newcivilengineer.comAs part of its work as HS2’s main works contractor, the joint venture between Balfour Beatty and Vinci (BBV) has begun using conveyor in a bid reduce the