Identifying Rock Loads on TBM Shields During Standstills (Non-Advance-Periods)
Paul J. Unterlass, Georg H. Erharter & Thomas Marcher
Geotechnical and Geological Engineering (2022)
https://link.springer.com/article/10.1007/s10706-022-02263-x
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://link.springer.com/article/10.1007/s10706-022-02263-x
Identifying Rock Loads on TBM Shields During Standstills (Non-Advance-Periods)
link.springer.comGeotechnical and Geological Engineering - Tunnel boring machine (TBM) operational data is mostly analysed with respect to data that was recorded during the advance of the TBM. Focusing on data that...