English | Spanish | Dutch
Log in

Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel / Open Access Article

    Tim Altman
    By Tim Altman Replies (1)

     

    Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel

    Mohammad Mohammadi, Johan Spross & Håkan Stille
    Rock Mechanics and Rock Engineering (2022)

    https://link.springer.com/article/10.1007/s00603-022-03022-3

    image

    image