English | Spanish | Dutch
Log in

Construction of Nagdhunga tunnel construction begins

    Ravnish Sharma
    By Ravnish Sharma Replies (2)

    Construction of the Nagdhunga Tunnel started with on both ends of Dhading and Kathmandu.

    The tunnel is 2.7 km long 12 meter wide 8 meter high. Japan’s Hajma Ando Corporation could not start construction because Nepal Army did not grant permission for import of explosives and came COVID_19 pandemy. Now back to business.

    https://thehimalayantimes.com/nepal/much-awaited-nagdhunga-tunnel-construction-begins-amid-covid-19-crisis/

     

    image

    image