Null

English | Spanish | Dutch
Log in

China : Prefabrication of immersed tube E23 of Shenzhen-Zhongshan highway underwater tunnel completed

    Caihong Wen
    By Caihong Wen Replies (1)

     

    The prefabrication of E23, the last immersed tube (non-standard tube, including the final joint) of an underwater tunnel, a section of highway linking Shenzhen and Zhongshan in Guangdong, was completed on Tuesday. With a total length of 6,845 meters, the underwater tunnel consists of 5,035-meter-long prefabricated immersed tubes, including 32 ones and a final joint.

    https://english.www.gov.cn/news/photos/202302/02/content_WS63db3a00c6d0a757729e643a.html

    image

    image