The prefabrication of E23, the last immersed tube (non-standard tube, including the final joint) of an underwater tunnel, a section of highway linking Shenzhen and Zhongshan in Guangdong, was completed on Tuesday. With a total length of 6,845 meters, the underwater tunnel consists of 5,035-meter-long prefabricated immersed tubes, including 32 ones and a final joint.
https://english.www.gov.cn/news/photos/202302/02/content_WS63db3a00c6d0a757729e643a.html
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://english.www.gov.cn/news/photos/202302/02/content_WS63db3a00c6d0a757729e643a.html
Prefabrication of immersed tube E23 of Shenzhen-Zhongshan highway underwater tunnel completed
english.www.gov.cn