Null

English | Spanish | Dutch
Log in

Series of errors that led to 2005 Tesco tunnel collapse finally revealed

A newly unearthed Health and Safety Executive (HSE) report into the 2005 Gerrards Cross tunnel collapse has revealed the sequence of events that led to the structures failure during construction.

https://www.newcivilengineer.com/latest/series-of-errors-that-led-to-2005-tesco-tunnel-collapse-finally-revealed-12-05-2023/

image

image