Optimization of Tunnel Construction Schedule Considering Soft Logic
by Jianying Wei, Yuming Liu, Xiaochun Lu, Yu Feng and Yadi Wang
School of Economics and Management, Beijing Jiaotong University, Beijing 100044, China
Open AccessArticle. No money.
https://www.mdpi.com/2076-3417/14/6/2580
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.mdpi.com/2076-3417/14/6/2580
Optimization of Tunnel Construction Schedule Considering Soft Logic
www.mdpi.comTunnel construction projects are a classic type of repetitive project, and hold a crucial position in the construction industry. The linear scheduling method (LSM) has been in the spotlight in scheduling optimization for repetitive construction...