Greenfield settlements due to tunnelling using tunnel boring machine (TBM) in layered soils: a parametric study
Jyoti Agarwal
Civil Engineering Department, Delhi Technological University, Shahbad Daulatpur Main Bawana Road, Delhi, 110042, India
Raju Sarkar
Civil Engineering Department, Delhi Technological University, Shahbad Daulatpur Main Bawana Road, Delhi, 110042, India
https://link.springer.com/article/10.1007/s12046-023-02425-4
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://link.springer.com/article/10.1007/s12046-023-02425-4
Greenfield settlements due to tunnelling using tunnel boring machine (TBM) in layered soils: a parametric study
link.springer.comSādhanā - As India’s cities continue to increase in population, a large number of new metro lines are being built to accommodate the mobility of residents. For construction of these...