How was the geotechnical monitoring done and what methods used for Doha metro construction?

    Ahmad Kader
    By Ahmad Kader Replies (1)

     

    Doha Metro's Gold Line has been built by Yapi Merkezi (Turkey), STFA Group (Turkey), Larsen & Toubro (India), Aktor (Greece) and Al Jaber Engineering (Qatar). It opened for passengers on 21 November 2019. It is comprised of twin tunnels each of which is ~16km long.

    The construction used 6 Tunnel Boring Machines from Herrenknecht to bore 32km long tunnels on average 20 meters below ground.

    Geotechnical work was done by Encardio-rite. Here you see which methods they used to monitor the geotechnical conditions during the construction:

    https://www.urbantransportnews.com/geotechnical-monitoring-of-the-historical-doha-metro-gold-line/

     