Null

English | Dutch | Spanish

Romania accept bids for Meseș road tunnel until September 2020

    I. Stoica
    By I. Stoica

    The Minister of Transport Lucian Bode said for the new road between Poarta Sălajului and Zalău, respectively Zalău - Nușfalău (41 km), including the Meseș tunnel, the deadline for submitting bids is in September 2020.

    https://zcj.ro/economie/vom-da-in-folosinta-25-km-din-autostrada-transilvania--200940.html

     

     

    Null

    Null