Hongsu Ma, CNNC Key Laboratory on Geological Disposal of High-level Radioactive Waste, Beijing Research Institute of Uranium Geology, Beijing, China
Ju Wang, CNNC Key Laboratory on Geological Disposal of High-level Radioactive Waste, Beijing Research Institute of Uranium Geology, Beijing, China
Ke Man, North China University of Technology, Beijing, China
Liang Chen, CNNC Key Laboratory on Geological Disposal of High-level Radioactive Waste, Beijing Research Institute of Uranium Geology, Beijing, China
Qiuming Gong, Key Laboratory of Urban Security and Disaster Engineering of Ministry of Education, Beijing University of Technology, Beijing, China
Xingguang Zhao, CNNC Key Laboratory on Geological Disposal of High-level Radioactive Waste, Beijing Research Institute of Uranium Geology, Beijing, China
Received 31 October 2019,
Revised 30 May 2020,
Accepted 9 September 2020,
Available online 2 November 2020.
Highlights
• Technical challenges for excavation of Underground Research Laboratory in granite by TBM are indentified and feasibility researches are conducted.
• Penetration rate and rock mass boreability for a granite URL are predicted by cutting test, prediction model and case comparison.
• Feasibility on TBM excavation for a special layout of the spiral ramp is discussed.
Total paper you read
https://www.sciencedirect.com/science/article/pii/S1674775520301323
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://www.sciencedirect.com/science/article/pii/S1674775520301323
Excavation of underground research laboratory ramp in granite using tunnel boring machine: Feasibility study
www.sciencedirect.comUnderground research laboratory (URL) plays an important role in safe disposal of high-level radioactive waste (HLW). At present, the Xinchang site, l…