"We canceled the original design of the inclined shaft in the reserve to dig the tunnel, reducing its footprint by more than 2.6 hectares,"
We used the heading method -- drilling at the entry and exit of the tunnel, which doubled the construction time but protected the natural environment,"
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
http://www.xinhuanet.com/english/2021-04/09/c_139869823.htm
China Focus: China builds green rail linking Laos - Xinhua | English.news.cn
www.xinhuanet.com