Null

English | Spanish | Dutch
Log in

Norway TBMs' Hard Rock Concert -

TBMN.jpg

A $3.4-billion high-speed railroad tunnel to Oslo.

Norway's Bane NOR's engineers had an enormous challenge. Hard abrasive rock and a lot of water! And an Italian contractor in financial difficulties running project late for months and over budget.

To TBM or Drill and Blast? How was the decision making process?

Read all about it in this ENR article. It is a treat!

https://www.enr.com/articles/47369-norway-tbms-hard-rock-concert

  • Lutz Genscher
    By Lutz Genscher

    Herrenknecht TBMs performed well in this project. Choosing TBMs was the right decision.

  • Ari G.J. van der Dijk
    By Ari G.J. van der Dijk

    A really good article. I think every tunnelling project manager, manager and engineer should read this article

  • Roberto Calvi
    By Roberto Calvi

    Pleasure to read but in retrospect would Norwegians still choose TBM?

    When I was visited Bergen (on the same day the WTC 2017 started) I met a respected Norwegian professor on the street just by coincidence. He told me that the operation of TBMs was very costly. The rocks were eating disc cutters like rubber.

image

image