Null

English | Spanish | Dutch
Log in

China Tunnel Technology: A Combined Discrete Element-Finite Difference Model for Simulation of Double Shield TBM excavation in Jointed Rocks

    Chu Yang
    By Chu Yang Replies (1)

    A Combined Discrete Element-Finite Difference Model for Simulation of Double Shield TBM excavation in Jointed Rocks

    Bo Sun

    PowerChina Chengdu Engineering Corporation Limited, Chengdu, China

    Sun, B. A Combined Discrete Element-Finite Difference Model for Simulation of Double Shield TBM excavation in Jointed Rocks. Rock Mech Rock Eng (2021). https://doi.org/10.1007/s00603-021-02560-6

    Received 23 February 2021 Accepted 21 June 2021 Published 07 July 2021

    Sorry read with money:

    https://link.springer.com/article/10.1007/s00603-021-02560-6#citeas

    image

    image