English | Spanish | Dutch
Log in

Construction of second tunnel on Novosibirsk "Zolotoy Niva" estimated at 1.3 billion rubles

    Bogdan A. Dašić

    The length left shallow running tunnel is 526 meters. The depth of the tunnel, from top of the tunnel to the surface, is 5 to 6 meters. Cost estimate is 1.3 billion rubles, Novosibirsk mayor's office said.

    https://ngs.ru/text/transport/2021/07/14/70023701/

    image

    image