The length left shallow running tunnel is 526 meters. The depth of the tunnel, from top of the tunnel to the surface, is 5 to 6 meters. Cost estimate is 1.3 billion rubles, Novosibirsk mayor's office said.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://ngs.ru/text/transport/2021/07/14/70023701/
Строительство второго тоннеля на «Золотой Ниве» оценили в 1,3 млрд рублей
ngs.ruСроки начала работ неизвестны