A Graduate thesis at the University of Ljubljana.
Author: Anže Kovačič
Mentor: Assist. Prof. Božo Koler, Ph.D.
Co-mentor: Assist. Tilen Urbančič, Ph.D.
Document type: Graduation Thesis – Higher professional studies
Abstract
The construction of the unfinished railway tunnel in the vicinity of Godovič began during the First
World War for the needs of supplying the front, the tunnel was part of a single-track railway line
between Logatec and Črni Vrh. Due to the rapid movement of the front line to the west, construction
stopped, leaving the tunnel abandoned in the woods. As part of the graduation thesis, we scanned the
tunnel with a terrestrial laser scanning and performed various comparisons of data with previous cave
measurements and projected values on the basis of a georeferenced point cloud.
https://repozitorij.uni-lj.si/IzpisGradiva.php?id=124584&lang=eng
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
https://repozitorij.uni-lj.si/IzpisGradiva.php?id=124584&lang=eng
Določitev geometričnih lastnosti nedokončanega železniškega predora v Godoviču
repozitorij.uni-lj.si