In Prague, the design and preparation process of the new metro line D is in full swing. A planned line has on its way in total ten stations, and one of them is station Pankrac. The mined metro station with a complex system of transfer halls and with a connection to the current metro line C.
This webinar introduces the initial static design and modeling procedure regarding unfavorable geotechnical conditions. Finally, a brief overview of the current design and construction work on metro line D is given.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
Case Study: New Metro Construction with Connection to the Existing Line
www.youtube.comThe design and preparation process of the new metro line D is in full swing. A planned line has on its way in total ten stations, and one of them is station ...