The Tunnel Boring Machine (TBM), Bhadra breakthrough after boring 1,066 metres emerging at Shadi Mahal near Tannery Road on December 16 for the Pink Line.
cover tunnel photo by: Matt Brown from London, England / CC BY
Copyright 2019-2024 TunnelContact.com
www.youtube.com